Radiation Safety Lab Renovation An outdated X-ray laboratory was transformed into a modern training and calibration space for Stony Brook’s Radiation Safety program. Full Project Overview
Computer Science Building Classroom 2120 The renovation transformed Classroom 2120 into a modern, technology-enhanced learning environment with upgraded instructional systems, flexible seating, improved accessibility, and power at every seat. Full Project Overview
Southampton EV Dual-Port Chargers The project demonstrates the university's commitment to cleaner transportation by expanding access to sustainable mobility infrastructure for the campus community. It also supports the university's efforts to reduce greenhouse gas emissions and advance New York State's clean transportation goals. Full Project Overview
Stony Brook University Pollinator Garden Campus Operations & Maintenance transformed an underutilized space into a native pollinator garden that supports biodiversity, advances sustainability, and provides a vibrant gathering place for the campus community. Full Project Overview
Southampton Gate Enhancement Campus Operations & Maintenance and Campus Planning, Design & Construction revitalized the historic South Gate with new university signage, restored architectural features, and enhanced landscaping. Full Project Overview
Avram Theatre Entrance The Fine Arts ADA Access Upgrade improved accessibility, safety, and appearance with reconstructed ramps, walkways, steps, and pathways that meet current ADA standards at Stony Brook Southampton. Full Project Overview
Point of Woods Building Demolition Campus Planning, Design & Construction removed three long-vacant buildings near the hospital's north entrance, improving safety, enhancing a key campus gateway, and preparing the site for future development. Full Project Overview
Occupancy-Based HVAC Control The Office of Sustainability connected classroom scheduling with HVAC controls to automatically adjust heating and cooling based on room use, reducing energy consumption, improving efficiency, and lowering operating costs. Full Project Overview
ADA Sidewalk Revisions Campus Operations and Maintenance completed seven ADA-focused exterior improvements, repairing non-compliant pathways and creating safer, smoother, and more accessible pedestrian routes. Full Project Overview
Classroom Furniture Repair Program Campus Operations and Maintenance launched a classroom furniture repair and replacement program, restoring desks and seating while improving safety, functionality, and ADA accessibility across 120 registrar-controlled classrooms and lecture halls. Full Project Overview
Life Science Research Laboratory #537 Campus Planning, Design & Construction renovated Life Science Research Laboratory #537, creating a modern, state-of-the-art space with upgraded safety features, specialized research rooms, and improved workflow to support advanced neurobiology research. Full Project Overview
SBU Landmark Letters Campus Planning, Design & Construction installed landmark “Stony Brook University” letters at the Student Union, creating an ADA-accessible, illuminated gathering space that strengthens campus identity and school spirit. Full Project Overview
Wolfie Statue and Seating Area Campus Planning, Design & Construction installed a seven-foot Wolfie statue and landscaped seating area at the Academic Mall, creating a welcoming gathering space that celebrates Seawolf pride and campus spirit. Full Project Overview
Storm Damage Response Facilities & Services restored storm-damaged residence halls, academic and research spaces, repairing severe flooding and relocating critical infrastructure while strengthening campus resilience through enhanced stormwater and flood mitigation improvements. Full Project Overview
Oral Biology Labs The School of Dental Medicine renovated its Oral Biology labs, installing modern workstations and ADA-accessible features to create fully equipped, state-of-the-art spaces for advanced dental education and clinical preparation. Full Project Overview
ADA Door Replacement Program Campus Operations and Maintenance replaced 13 South Campus entrance doors, bringing buildings into ADA compliance while improving safety, functionality, and accessibility for students, faculty, and staff. Full Project Overview
The Nicolls Road Beautification Project Campus Operations and Maintenance planted more than 215 Green Giant Arborvitae trees along Nicolls Road, creating a natural evergreen barrier that enhances campus aesthetics and strengthens community-facing views. Full Project Overview